Kitchens open to the living room in Rincón de la Victoria
Before evaluating a removal, it is important to identify the wall, the elements it receives and the known facilities that could cross it. Some conditions require a specific technical review. The objective of opening the space must be related to this information, avoiding setting the size or shape of the space solely based on the furniture that is to be placed or a reference scene.
Tell us about your kitchen
Choose the type of renovation and the approximate size. Then write to us or fill out the form.
The wall, the connections and the steps
- FeasibilityTechnical review of the space.
- LayoutDraw how the two rooms will be used.
- PartitionsCheck the type of wall and its conditions.
- FacilitiesSort the connections before choosing the furniture.
- ExtractionThink about where the extraction is resolved.
- FloorsStudy changes in level and materials.
- FurnitureIsland or peninsula options.
- AuctionsPlan joints so that they are not improvised.
Quote for kitchens open to the living room in Rincón de la Victoria
Separate checking and completion work
A possible opening may require different auctions on floor, ceiling and both sides of the wall. Consult kitchen floor to define your encounter if there is a footprint that needs work. The proposal should indicate which finishes remain and how far the areas concerned are repaired, so that the scope can be reviewed as a set of concrete actions with their preparations.
Check the layout with the defined gap
Circulation and openings should be tested on the dimensions of space and on the technically studied scope. In small kitchen supports and storage can be compared without occupying the step that is intended to improve. The valuation must keep the outstanding checks visible before treating as definitive a composition that depends on the wall and the existing services in the house.
Quote and scope of work at Rincón de la Victoria
The opening scope is defined after identifying the wall and its installations, incorporating the necessary technical review before evaluating the removal and finishing.






